|
Closeup of Force Draft Fan and Steam Drum on #2 Boiler
|
|
The Main Boiler Furnace is fueled by gas. These pipes receive the gas from Niagara Mohawk. If a gas shortage occurs, Niagara Mohawk requires that Rensselaer switch over to oil for their fuel. Rensselaer spends approximately $1 million a year on fuel (gas and oil.)
|
|
|
This is the Air Compressor for the Boiler House
|
|
Boiler #3 is used in the summer for hot water and to provide steam for the Absorption Chiller for Cogswell, VCC, MRC, Polymer, and the Library.
|
|
|
An overhead view from the office's picture window on the second floor.
|
|
An overhead view from the office's picture window on the second floor.
|
|