The following is a summary of a depositon run:
- Make a reservation (optional). See section 3.1
- Before you touch the evaporator, start a log entry. See section 3.2
- Vent the deposition chamber. See section 3.3
- Perform pre-load operations. See section 3.4
- Load metal chages into the hearth. See section 3.5
- Load your samples. See section 3.6.
- Pump down the deposition chamber. See section 3.3
- Program the IC6000. See section 3.8
- Initialize the e-beam high voltage system. See section 3.7
- Perform the Evaporation. See section 3.9
- Shut down the e-beam high voltage system. See section 3.7
- Vent the deposition chamber. See section 3.3
- Remove samples, metal charges, and close your log entry. See section 3.2
- Pump down the deposition chamber. See section 3.3