Control Panel

The control is basically set up as a large process flow diagram with lights and
meters to warn the controllers when something goes wrong. At the left
(bottom left in grey) you can see the four primary clarifiers that lead into
the aeration basins (bottom middle, brownish) and finally to the final
clarifiers. At the top left is the composting system (7 bins) and right
below that is the surge lagoon. At the very far right are the lagoons that
were left over from the original design. The set of meters and lights in the
dead center represents the sludge handling building and right to the right of
this is the chlorine contact tank.